Construction of new student homes

Type of machine:

Application: transport platform

For the construction of various residential blocks for student homes for the VUB, a transport platform MBC2000 with a capacity of 1500 kg was chosen. In order to ensure that there is no step on the various floors, the gates were mounted on a vertical structure in front of the facade. The lift was moved several times throughout the different phases of the project.