Several construction hoists and mast climbing platforms for hotel in Antwerp

Type of machine:

Application: transport platform / work platform

This project had a lot of challenges. Time pressure was very high and the available space on the site was limited. To maximize the productivity on site, the façades were finished by means of 10 mast climbing platforms and 2 construction lifts. During the installation, it was ensured that all pieces were pre-assembled to limit the number of manipulations and the occupation of the tower crane on site. The dimensions and anchoring of the mast climbing platforms were specifically adapted as well to make sure that no anchoring would be in the way of the facade panels.