Construction hoist for residential tower of 90m high in Antwerp south

Type of machine:

Application: construction hoist for tower of 90m

With this building project of more than 25 floors, the time pressure was very high. From the structural work to the complete finish, all contractors must be able to work smoothly. The MBA1400 is ideally suited for this. With a speed of 60m / min and a capacity of 17 people, no time is lost. The big challenge in this project was the various balconies where the anchoring had to be adjusted to.