Hospital renovation

Type of machine:

Application: transport platform for acces to scaffolding

The renovation of the 10th floor happened while the other floors remained operational. It was therefore necessary that all movements of personnel and material were done via the transport platform on the outside. Because the building had an extended floor plan of 20m for the first 3 floors, a passerel was used that could bridge this distance. This ensured that special attention was required for the anchoring of the hoist.